Skip to content

Snowball

Questions

Q: For security purposes, data transfers must be completed whithin 90 days of the snowball being prepared.

Intro

  • Petabyte-sale data transfer service, note we have to use multiple ones to acheive that since the only available options are 50 TB and 80 TB
  • Low cost 1/5th the cost of transfering 100TB over high speed internet which is suually 1000s of dollars
  • Speed 100TB usually takes 100 days to transfer, snowball reduce that by less than a week
  • E-Ink dispaly (lable for shipping information)
  • Tamper and weather proof
  • Data is encrypted end-to-end (265-bit encryption)
  • uses Trusted Platform Module (TPM) which is a specialized ship that stores RSA keys specific to the host system for hardware authentication
  • Can Import/Export from S3
  • it come with 50 TB (42 TB usable) and 80 TB (72 TB usable) objects
  • For security purposes, data transfers must be completed whithin 90 days of the snowball being prepared.

Snowball Edge

  • More storage an on-site compute capabilites
  • It has orange handles, maye that how we make visual disnction between the previous model
  • LCD display (shipping information and other functionality)
  • Can undertake local processing and edge-computing workloads
  • Can be clustered in groups of 5 to 10 devices
  • Three options for device configurations:
    • Storage optimized (24 vCPUs)
    • Compute optimized (54 vCPUs)
    • GPU optimized (54 vCPUs)
  • Two options:
    • 100 TB (83 TB of usable space)
    • 100 TB Clustered (45 TB per node)

Snowmobile

  • For exabytes-scale data
  • 45-foot long ruggedized shipping container, pulled by a semi-trailer truck transfer up to 100PB per Snowmobile
  • Security: GPS, Alarm, 24/7 video surveillance, an escort security vehicle while in transit (optional)
  • AWS personnel wil help you with that